


Pacific Palisades Fire Rebuild
After the devastating Palisades fire, this family turned to Forma Homes to rebuild their home from the foundation up. We are currently in the foundation phase — installing structural steel columns, laying a dense rebar grid, and pouring a reinforced concrete slab engineered to exceed current seismic and fire-resistance codes. Every beam and tie has been placed with precision, setting the stage for a full custom rebuild. This is more than reconstruction — it is an opportunity to build back stronger, smarter, and more beautifully than before. From permits and engineering through final finishes, our team is managing every detail so this family can focus on what matters most.
Explore Forma Homes services in Pacific Palisades
Location
Pacific Palisades, CAScope
Whole-home rebuild after wildfire — new foundation, structural steel, and full home reconstruction
Key Finishes
- Structural steel column and beam framework
- Reinforced rebar foundation grid
- Engineered concrete slab pour
- Full seismic and fire-code compliance
- Whole-home custom reconstruction
Duration
In Progress
Similar Forma Homes Projects
View all projects
Bel Air Home Transformation
Complete whole-home renovation — kitchen, bathrooms, living areas, decorative finishes, and custom millwork throughout

Bel Air Foyer Remodel, Custom Game Room, and Custom Dining Room
Multi-room renovation — custom foyer with double-height curved wainscoting, formal dining room with scenic wallpaper and millwork, game room with bookmatched marble fireplace and custom built-ins, wide-plank oak flooring, lacquer painting throughout, new windows, and lighting

Encino Condo Refresh
Full condo renovation — 2 bathrooms, new kitchen, complete repaint, MEP systems, and panel upgrade
Inspired by this project?
Let's bring your vision to life. Schedule a free consultation today.
Start Your Project