coastal · Services

Backyard Remodeling & Outdoor Living in Playa Del Rey

Playa Del Rey, Los Angeles

Forma Homes delivers backyard remodeling & outdoor living across Playa Del Rey and the surrounding coastal neighborhoods of Los Angeles. Playa Del Rey remodeling — hillside coastal homes and 1940s–60s flats.

Schedule a Consultation
  • License #1140511
  • Licensed & Insured
  • Serving LA's Westside
Backyard Remodeling & Outdoor Living in Playa Del Rey, Los Angeles by Forma Homes

What makes backyard remodeling & outdoor living different in Playa Del Rey

Playa Del Rey splits between bluff-top hillside parcels with view-driven layouts and the flats near the dunes. Coastal Commission jurisdiction applies. Older 1940s and 1950s flats often have galvanized plumbing, undersized electrical, and detached garages ripe for ADU conversion. We've remodeled in Playa often enough to know which permit shortcuts actually save weeks and which just push delays downstream.

Hillside parcels in Playa Del Rey carry their own engineering load. Drainage, retaining-wall design, caissons where pools or major additions are part of the scope, and fire-zone defensible-space requirements all shape how a backyard remodeling & outdoor living project gets sequenced. We coordinate hillside engineering at the design phase, not at construction.

Playa Del Rey sits in the California Coastal Zone, which means Coastal Commission review applies on top of standard permitting. We plan around that — typically 8–16 weeks of additional plan-check time depending on scope. Salt-air corrosion also drives material decisions: copper and stainless flashings, marine-grade fasteners, and assemblies engineered for marine exposure are the default rather than the upgrade.

Most Playa Del Rey homes were built before 1980. That means galvanized supply lines, undersized electrical panels, original gas runs, and rough-in plumbing that hasn't been touched in decades. Once walls open during a backyard remodeling & outdoor living project, we expect to bring the underlying systems to current code — not as a surprise, as a plan.

Playa Del Rey runs its own permitting through LADBS + Coastal Commission. Plan-check timelines run on a separate clock from LADBS. We've worked through the local department often enough to know what their reviewers flag and what they wave through, so we submit the right drawing set the first time.

Common architecture in Playa Del Rey: Mid-Century Modern, Spanish Colonial Revival, Contemporary. We design coastal renovations to honor what's already there while bringing systems and finishes up to current code and current standards.

What's Included

  • Pool and spa design and construction
  • Hardscape — pavers, concrete, natural stone
  • Outdoor kitchen and BBQ islands
  • Fire pits and fire features
  • Landscape design and installation
  • Lighting and irrigation systems
  • Fencing and privacy screening
  • Permit management

How Much Does a Backyard Remodel Cost in Los Angeles?

Pricing in Playa Del Rey follows the same tiers we publish for every Los Angeles project — every estimate is grounded in your actual scope.

  • Outdoor refresh$40K – $100K
  • Full backyard remodel$100K – $300K
  • High-end pool / structural$300K – $750K+

What drives final cost

Hardscape, decking, pool work, outdoor kitchens, fire features, structural elements, drainage and waterproofing, lighting and electrical, irrigation, plant material, permit requirements, and site access all influence final cost.

Every Playa Del Rey project is unique. Schedule a free consultation for a detailed estimate.

Get a Free Estimate

*Ranges are typical estimates for Los Angeles projects, for informational purposes only. Not a quote, bid, or contractual offer. A binding price is established only through a signed written contract.

Backyard Remodeling & Outdoor Living in Playa Del Rey — Frequently Asked Questions

A new pool with surrounding hardscape typically takes 3–5 months from permit to completion. A hardscape-only project without a pool can be completed in 4–8 weeks.

Yes. Pool permitting in Los Angeles can be complex. We handle all applications, plan checks, and inspections.

Yes. We have extensive experience with hillside lots including retaining walls, drainage systems, and grading. Our Beverly Hills South Spalding project involves 4 caissons driven into a hillside.

Outdoor refreshes typically run $40K – $100K, full backyard remodels $100K – $300K, and high-end pool or structural projects $300K – $750K+. Hardscape, pool work, and structural elements drive the largest swings.

We coordinate pool work with licensed pool partners and integrate it with hardscape, decking, equipment screening, and landscape so the whole backyard reads as one cohesive design.

Yes. We design and build outdoor kitchens with appropriate gas, plumbing, electrical, drainage, and stone or tile finishes engineered for outdoor exposure.

Most full backyard projects run 4 – 9 months depending on scope, structural work, pool sequencing, and city plan check timing.

Often, yes. Pools, structural elements, electrical and gas service, drainage changes, and certain hardscape work typically require permits. We handle submittals and inspection coordination.

Ready to start your backyard project?

Schedule a free consultation and get a transparent estimate for your Playa Del Rey home.

Schedule a Consultation