westside · Services

Ground-Up & Fire Rebuild Construction in Westwood

Westwood, Los Angeles

Forma Homes delivers ground-up & fire rebuild construction across Westwood and the surrounding westside neighborhoods of Los Angeles. Westwood remodeling — Holmby Westwood, Westwood Hills, and the streets around the Village.

Schedule a Consultation
  • License #1140511
  • Licensed & Insured
  • Serving LA's Westside
Ground-Up & Fire Rebuild Construction in Westwood, Los Angeles by Forma Homes

What makes ground-up & fire rebuild construction different in Westwood

Westwood's residential streets sit south of UCLA and east of the 405. The Westwood Hills and Holmby Westwood blocks carry pre-war estates with original lath-and-plaster, single-pane windows, and undersized electrical service. Closer to the Village, post-war traditionals and a few mid-century moderns dominate. Most kitchens and bathrooms in Westwood need full MEP rework when remodeled — code-compliance is the floor, not the ceiling.

Most Westwood homes were built before 1980. That means galvanized supply lines, undersized electrical panels, original gas runs, and rough-in plumbing that hasn't been touched in decades. Once walls open during a ground-up & fire rebuild construction project, we expect to bring the underlying systems to current code — not as a surprise, as a plan.

Common architecture in Westwood: Spanish Colonial Revival, Tudor, Traditional. We design westside renovations to honor what's already there while bringing systems and finishes up to current code and current standards.

What's Included

  • Architectural and engineering coordination
  • Permitting — LADBS, BH, Santa Monica, Coastal, HPOZ, hillside
  • Foundation, framing, and structural
  • MEP — electrical, plumbing, HVAC rough and finish
  • Building envelope — windows, doors, roofing, cladding
  • Custom millwork, cabinetry, and finish carpentry
  • Stone fabrication, flooring, paint, and tile
  • Insurance coordination for fire and water losses
  • Smoke and contamination remediation
  • Final walkthrough, punch list, and warranty

Ground-Up & Fire Rebuild Construction in Westwood — Frequently Asked Questions

Everything from raw land or a demo footprint through final walkthrough — soils, foundation, framing, MEP rough and finish, envelope, windows, doors, roofing, exterior cladding, interior millwork, custom cabinetry, stone fabrication, flooring, paint, fixtures, and landscape coordination. We work alongside your architect and own the build.

Yes. We mobilize an emergency assessment, document damage for your insurer, develop a complete Xactimate-style scope, and coordinate directly with your adjuster. We have rebuilt homes after the Pacific Palisades fires and after major water-loss events across the Westside. Insurance typically covers the majority of cost when the scope is properly documented — we advocate for the full scope your home needs.

Most ground-up homes in Los Angeles run 14–24 months from groundbreak to final, depending on size, lot complexity (hillside, HPOZ, coastal), and architectural scope. We provide a detailed schedule before contract.

A contained fire with localized damage can be 3–5 months. A full rebuild involving structural work, MEP, and complete interior finishes typically runs 8–14 months. Schedule is driven by insurance approval, permitting, and material lead times.

Yes. We specialize in matching existing materials — hardwood species, stone slabs, paint colors, cabinet styles, hardware. Where an exact match is not available, we source equal or upgraded alternatives and walk you through the options.

Beverly Hills, Bel Air, Brentwood, Pacific Palisades, Santa Monica, Malibu, Mandeville Canyon, the Hollywood Hills, Encino, Sherman Oaks, and most Westside / Valley luxury markets. We coordinate with LADBS, BH Building & Safety, Santa Monica, Coastal Commission, HPOZ review, and hillside ordinance reviewers as required.

Planning a build or rebuilding after a loss? Talk to us today.

Call (424) 402-5384 — we'll come out within 48 hours.

Call (424) 402-5384